COVID Entrances

The official building entrances during the pandemic are as follows:

Building A - Health Sciences 2

Entrance on the north side of the building facing Holston Lane.

Building B - Health Sciences Building

Entrance on the south side of the building facing Holston Lane.

Building C - Health Education Building

Entrance on the east side of the building facing Holston Lane.

Building D - Allied Health Building

Entrance on the north side of the building facing the ILC building.

Building E - ILC

Entrance on the south side of the building facing Allied Health building.